Full accommodation including kitchen and bathroom, unfolding from transport state into a fully functional house within four hours.

From transport state to a complete house without a crane or heavy machinery. See how deployment works:

Base cabinets and a fully equipped sink, arranged according to the chosen layout.

Shower, toilet, washbasin and bathroom cabinets. Wet and dry zones separated, several finishes to choose from.

Double insulated glazing, insulated metal frames and optional insect screens.

PVC flooring in a range of colours on waterproof cement-fibre panels.

Tankless water heater — hot water in both kitchen and bathroom.

230V sockets with a fuse box and integrated lighting in the synthetic bamboo-fibre ceiling.
A sketch or a list of requirements is enough — we will prepare a solution tailored to your needs and deployment conditions.